Gibraltar vs Lesotho: Electricity generation from solar
Gibraltar
0 terawatt-hours
in 2024
Lesotho
0 terawatt-hours
in 2024
Gibraltar rank
181st
Lesotho rank
181st
Electricity generation from solar over time
- Gibraltar
- Lesotho
How they compare
Gibraltar currently reports 0 terawatt-hours against 0 terawatt-hours in Lesotho, a difference of 0 terawatt-hours.
Across all 25 years both countries report, Lesotho has been ahead every year.
Gibraltar ranks 181st and Lesotho ranks 181st of 214 countries.
Head to head by decade
| Decade | Gibraltar | Lesotho | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2010s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2020s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electricity generation from solar, Gibraltar or Lesotho?
- Gibraltar, at 0 terawatt-hours against 0 terawatt-hours in Lesotho as of 2024.
- What is the difference in electricity generation from solar between Gibraltar and Lesotho?
- 0 terawatt-hours, with Gibraltar ahead.
- How many years of comparable data are there for Gibraltar and Lesotho?
- 25 years are reported by both, from 2000 to 2024.
- How do Gibraltar and Lesotho rank globally for electricity generation from solar?
- Gibraltar ranks 181st and Lesotho ranks 181st of 214 countries.
- Where does this data come from?
- Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data, published as Electricity generation from solar. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours.