Grenada vs Macao: Electricity generation from solar
Grenada
0 terawatt-hours
in 2024
Macao
0 terawatt-hours
in 2024
Grenada rank
181st
Macao rank
181st
Electricity generation from solar over time
- Grenada
- Macao
How they compare
Grenada currently reports 0 terawatt-hours against 0 terawatt-hours in Macao, a difference of 0 terawatt-hours.
Across all 25 years both countries report, Macao has been ahead every year.
Grenada ranks 181st and Macao ranks 181st of 214 countries.
Head to head by decade
| Decade | Grenada | Macao | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2010s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2020s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electricity generation from solar, Grenada or Macao?
- Grenada, at 0 terawatt-hours against 0 terawatt-hours in Macao as of 2024.
- What is the difference in electricity generation from solar between Grenada and Macao?
- 0 terawatt-hours, with Grenada ahead.
- How many years of comparable data are there for Grenada and Macao?
- 25 years are reported by both, from 2000 to 2024.
- How do Grenada and Macao rank globally for electricity generation from solar?
- Grenada ranks 181st and Macao ranks 181st of 214 countries.
- Where does this data come from?
- Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data, published as Electricity generation from solar. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours.