Grenada vs Montserrat: Electricity generation from solar
Grenada
0 terawatt-hours
in 2024
Montserrat
0 terawatt-hours
in 2024
Grenada rank
181st
Montserrat rank
181st
Electricity generation from solar over time
- Grenada
- Montserrat
How they compare
Grenada currently reports 0 terawatt-hours against 0 terawatt-hours in Montserrat, a difference of 0 terawatt-hours.
Across all 25 years both countries report, Montserrat has been ahead every year.
Grenada ranks 181st and Montserrat ranks 181st of 214 countries.
Head to head by decade
| Decade | Grenada | Montserrat | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2010s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2020s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electricity generation from solar, Grenada or Montserrat?
- Grenada, at 0 terawatt-hours against 0 terawatt-hours in Montserrat as of 2024.
- What is the difference in electricity generation from solar between Grenada and Montserrat?
- 0 terawatt-hours, with Grenada ahead.
- How many years of comparable data are there for Grenada and Montserrat?
- 25 years are reported by both, from 2000 to 2024.
- How do Grenada and Montserrat rank globally for electricity generation from solar?
- Grenada ranks 181st and Montserrat ranks 181st of 214 countries.
- Where does this data come from?
- Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data, published as Electricity generation from solar. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours.