Guam vs Serbia: Electricity generation from solar
Guam
0.16 terawatt-hours
in 2024
Serbia
0.16 terawatt-hours
in 2025
Guam rank
107th
Serbia rank
107th
Electricity generation from solar over time
- Guam
- Serbia
How they compare
Guam currently reports 0.16 terawatt-hours against 0.16 terawatt-hours in Serbia, a difference of 0 terawatt-hours.
The two have swapped places 2 times across 25 shared years of data; in 2000 it was Serbia ahead.
Guam ranks 107th and Serbia ranks 107th of 214 countries.
Guam has averaged higher in every one of the 3 decades both report.
Head to head by decade
| Decade | Guam | Serbia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2010s | 0.031 terawatt-hours | 0.006 terawatt-hours | 0.025 terawatt-hours | Guam |
| 2020s | 0.12 terawatt-hours | 0.05 terawatt-hours | 0.07 terawatt-hours | Guam |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electricity generation from solar, Guam or Serbia?
- Guam, at 0.16 terawatt-hours against 0.16 terawatt-hours in Serbia as of 2024.
- What is the difference in electricity generation from solar between Guam and Serbia?
- 0 terawatt-hours, with Guam ahead.
- How many years of comparable data are there for Guam and Serbia?
- 25 years are reported by both, from 2000 to 2024.
- How do Guam and Serbia rank globally for electricity generation from solar?
- Guam ranks 107th and Serbia ranks 107th of 214 countries.
- Where does this data come from?
- Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data, published as Electricity generation from solar. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours.