Lesotho vs Macao: Electricity generation from solar
Lesotho
0 terawatt-hours
in 2024
Macao
0 terawatt-hours
in 2024
Lesotho rank
181st
Macao rank
181st
Electricity generation from solar over time
- Lesotho
- Macao
How they compare
Lesotho currently reports 0 terawatt-hours against 0 terawatt-hours in Macao, a difference of 0 terawatt-hours.
Across all 25 years both countries report, Macao has been ahead every year.
Lesotho ranks 181st and Macao ranks 181st of 214 countries.
Head to head by decade
| Decade | Lesotho | Macao | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2010s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2020s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electricity generation from solar, Lesotho or Macao?
- Lesotho, at 0 terawatt-hours against 0 terawatt-hours in Macao as of 2024.
- What is the difference in electricity generation from solar between Lesotho and Macao?
- 0 terawatt-hours, with Lesotho ahead.
- How many years of comparable data are there for Lesotho and Macao?
- 25 years are reported by both, from 2000 to 2024.
- How do Lesotho and Macao rank globally for electricity generation from solar?
- Lesotho ranks 181st and Macao ranks 181st of 214 countries.
- Where does this data come from?
- Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data, published as Electricity generation from solar. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours.