Andorra vs Curacao: Solar (photovoltaic) panels cumulative capacity
Andorra
0.0096 gigawatts
in 2025
Curacao
0.0144 gigawatts
in 2025
Andorra rank
162nd
Curacao rank
159th
Solar (photovoltaic) panels cumulative capacity over time
- Andorra
- Curacao
How they compare
Curacao currently reports 0.0144 gigawatts against 0.0096 gigawatts in Andorra, a difference of 0.0048 gigawatts.
That makes Curacao's figure about 1.5 times Andorra's.
Across all 13 years both countries report, Curacao has been ahead every year.
Andorra ranks 162nd and Curacao ranks 159th of 199 countries.
Curacao has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Andorra | Curacao | Difference | Ahead |
|---|---|---|---|---|
| 2010s | 0.0003 gigawatts | 0.0096 gigawatts | 0.0093 gigawatts | Curacao |
| 2020s | 0.0041 gigawatts | 0.0136 gigawatts | 0.0095 gigawatts | Curacao |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher solar (photovoltaic) panels cumulative capacity, Andorra or Curacao?
- Curacao, at 0.0144 gigawatts against 0.0096 gigawatts in Andorra as of 2025.
- What is the difference in solar (photovoltaic) panels cumulative capacity between Andorra and Curacao?
- 0.0048 gigawatts, with Curacao ahead.
- How many years of comparable data are there for Andorra and Curacao?
- 13 years are reported by both, from 2013 to 2025.
- How do Andorra and Curacao rank globally for solar (photovoltaic) panels cumulative capacity?
- Andorra ranks 162nd and Curacao ranks 159th of 199 countries.
- Where does this data come from?
- IRENA (2026) β processed by Our World in Data, published as Solar (photovoltaic) panels cumulative capacity. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Solar photovoltaic (on-grid) electricity installed capacity, measured in gigawatts.