Portugal vs Viet Nam: Wind energy generation vs. installed capacity

Portugal
13,801 terawatt-hours
in 2025
Viet Nam
14,654 terawatt-hours
in 2025
Portugal rank
22nd
Viet Nam rank
20th

Wind energy generation vs. installed capacity over time

  • Portugal
  • Viet Nam
05.0k10.0k15.0k196519952025

How they compare

Viet Nam currently reports 14,654 terawatt-hours against 13,801 terawatt-hours in Portugal, a difference of 853 terawatt-hours.

That makes Viet Nam's figure about 1.1 times Portugal's.

The two have swapped places 2 times across 55 shared years of data; in 1971 it was Viet Nam ahead.

Portugal ranks 22nd and Viet Nam ranks 20th of 79 countries.

Portugal has averaged higher in every one of the 6 decades both report.

Head to head by decade

Decade Portugal Viet Nam Difference Ahead
1970s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours β€”
1980s 0.1 terawatt-hours 0 terawatt-hours 0.1 terawatt-hours Portugal
1990s 32.03 terawatt-hours 0 terawatt-hours 32.03 terawatt-hours Portugal
2000s 2,417 terawatt-hours 1.33 terawatt-hours 2,415 terawatt-hours Portugal
2010s 11,534 terawatt-hours 214.29 terawatt-hours 11,320 terawatt-hours Portugal
2020s 13,354 terawatt-hours 8,733 terawatt-hours 4,620 terawatt-hours Portugal

Averages of every year both report within each decade.

Frequently asked questions

Which has higher wind energy generation vs. installed capacity, Portugal or Viet Nam?
Viet Nam, at 14,654 terawatt-hours against 13,801 terawatt-hours in Portugal as of 2025.
What is the difference in wind energy generation vs. installed capacity between Portugal and Viet Nam?
853 terawatt-hours, with Viet Nam ahead.
How many years of comparable data are there for Portugal and Viet Nam?
55 years are reported by both, from 1971 to 2025.
How do Portugal and Viet Nam rank globally for wind energy generation vs. installed capacity?
Portugal ranks 22nd and Viet Nam ranks 20th of 79 countries.
Where does this data come from?
Energy Institute - Statistical Review of World Energy (2026) – with major processing by Our World in Data, published as Wind energy generation vs. installed capacity. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Portugal vs Viet Nam: Wind energy generation vs. installed capacity. Statizoid, drawing on Energy Institute - Statistical Review of World Energy (2026) – with major processing by Our World in Data. Retrieved 20 August 2026, from https://energy.statizoid.com/compare/wind-energy-generation-vs-installed-capacity/portugal/viet-nam/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://energy.statizoid.com/compare/wind-energy-generation-vs-installed-capacity/portugal/viet-nam/">Portugal vs Viet Nam: Wind energy generation vs. installed capacity</a> β€” Statizoid

About this data

Indicator
Wind energy generation vs. installed capacity
Unit
terawatt-hours
Source
Energy Institute - Statistical Review of World Energy (2026) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
81 places, 3,782 data points, 1965–2025
Last refreshed

Figures are based on gross generation and do not account for cross-border electricity supply.