Access to electricity, urban in Uganda

Uganda: Access to electricity, urban was 78.3% in 2024. ▲ Rising

Latest (2024)
78.3%
Change on year
up 2.5%
World rank
196th
of 215 countries
All-time high
78.3%
in 2024
All-time low
32.1%
in 1992
Years of data
34
1991–2024

Access to electricity, urban in Uganda, 1991–2024

0204060801991200720241991: 33.6 % of urban population1992: 32.1 % of urban population1993: 33.3 % of urban population1994: 34.4 % of urban population1995: 40.2 % of urban population1996: 36.7 % of urban population1997: 37.8 % of urban population1998: 38.9 % of urban population1999: 40 % of urban population2000: 41 % of urban population2001: 43.9 % of urban population2002: 39.3 % of urban population2003: 44.2 % of urban population2004: 45.3 % of urban population2005: 49 % of urban population2006: 41.8 % of urban population2007: 48.7 % of urban population2008: 49.9 % of urban population2009: 45 % of urban population2010: 48 % of urban population2011: 55.4 % of urban population2012: 54.6 % of urban population2013: 55.8 % of urban population2014: 51.4 % of urban population2015: 51.9 % of urban population2016: 57.5 % of urban population2017: 63.4 % of urban population2018: 72 % of urban population2019: 70.8 % of urban population2020: 70.1 % of urban population2021: 72.3 % of urban population2022: 72 % of urban population2023: 76.4 % of urban population2024: 78.3 % of urban population

Source: SDG 7.1.1 Electrification Dataset, World Bank (WB). Measured in % of urban population.

Analysis

The most recent figure for access to electricity, urban in Uganda is 78.3%, measured in 2024. That is the highest value across all 34 years on record.

The figure is up 2.5% on the previous year and up 52.3% over ten years.

Over the whole period, access to electricity, urban in Uganda peaked at 78.3% in 2024 and was at its lowest, 32.1%, in 1992.

Uganda ranks 196th of 215 countries on this measure, in the bottom quarter.

The long-run direction has been consistently rising across the 34 years of available data.

Access to electricity, urban in Uganda, year by year

Annual values for Access to electricity, urban (% of urban population) in Uganda, 1991 to 2024.
Year % of urban population Change
1991 33.6%
1992 32.1% -4.4%
1993 33.3% +3.6%
1994 34.4% +3.5%
1995 40.2% +16.8%
1996 36.7% -8.7%
1997 37.8% +3.0%
1998 38.9% +2.9%
1999 40.0% +2.8%
2000 41.0% +2.5%
2001 43.9% +7.1%
2002 39.3% -10.5%
2003 44.2% +12.5%
2004 45.3% +2.5%
2005 49.0% +8.2%
2006 41.8% -14.7%
2007 48.7% +16.5%
2008 49.9% +2.5%
2009 45.0% -9.8%
2010 48.0% +6.7%
2011 55.4% +15.4%
2012 54.6% -1.4%
2013 55.8% +2.2%
2014 51.4% -7.9%
2015 51.9% +1.0%
2016 57.5% +10.8%
2017 63.4% +10.3%
2018 72.0% +13.6%
2019 70.8% -1.7%
2020 70.1% -1.0%
2021 72.3% +3.1%
2022 72.0% -0.4%
2023 76.4% +6.1%
2024 78.3% +2.5%

Averages by decade

DecadeAverage LowestHighest Years
1990s 36.3% 32.1% 40.2% 9
2000s 44.8% 39.3% 49.9% 10
2010s 58.1% 48.0% 72.0% 10
2020s 73.8% 70.1% 78.3% 5

Countries ranked near Uganda

  1. 193 Zambia 80.3% compare
  2. 194 Mozambique 79.8% compare
  3. 195 Sao Tome and Principe 78.9% compare
  4. 197 Eritrea 78.1% compare
  5. 198 Angola 78.0% compare
  6. 199 Namibia 77.2% compare

See the full ranking of 263 places →

More energy & mining data for Uganda

All data for Uganda →

Frequently asked questions

What is access to electricity, urban in Uganda?
Access to electricity, urban in Uganda was 78.3% in 2024, according to SDG 7.1.1 Electrification Dataset, World Bank (WB).
What is the highest access to electricity, urban recorded in Uganda?
The highest recorded value was 78.3% in 2024.
What is the lowest access to electricity, urban recorded in Uganda?
The lowest recorded value was 32.1% in 1992.
How does Uganda rank for access to electricity, urban?
Uganda ranks 196th out of 215 countries with data for 2024.
Is access to electricity, urban rising or falling in Uganda?
Over the last ten years it is up 52.3%. The long-run trend across the full record is rising.
Where does this Uganda data come from?
The figures come from SDG 7.1.1 Electrification Dataset, World Bank (WB), published as part of Access to electricity, urban (% of urban population). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 34 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Access to electricity, urban in Uganda. Statizoid, drawing on SDG 7.1.1 Electrification Dataset, World Bank (WB). Retrieved 08 September 2026, from https://energy.statizoid.com/stat/access-to-electricity-urban-percent-of-urban-population/uganda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://energy.statizoid.com/stat/access-to-electricity-urban-percent-of-urban-population/uganda/">Access to electricity, urban in Uganda</a> — Statizoid

About this data

Indicator
Access to electricity, urban (% of urban population)
Unit
% of urban population
Source
SDG 7.1.1 Electrification Dataset, World Bank (WB)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
263 places, 8,113 data points, 1990–2024
Last refreshed

Access to electricity, urban is the percentage of urban population with access to electricity.