Ireland vs Spain: Annual change in primary energy use, per square kilometre

Ireland
-0.0001 terawatt-hours per square kilometre
in 2023
Spain
-0.0001 terawatt-hours per square kilometre
in 2023
Ireland rank
182nd
Spain rank
181st

Annual change in primary energy use, per square kilometre over time

  • Ireland
  • Spain
-0-000196619942023

How they compare

Spain currently reports -0.0001 terawatt-hours per square kilometre against -0.0001 terawatt-hours per square kilometre in Ireland, a difference of 0 terawatt-hours per square kilometre.

The two have swapped places 27 times across 58 shared years of data; in 1966 it was Ireland ahead.

Ireland ranks 182nd and Spain ranks 181st of 204 countries.

Across the 7 decades both report, Ireland averaged higher in 4 and Spain in 3.

Head to head by decade

Decade Ireland Spain Difference Ahead
1960s 0.0001 terawatt-hours per square kilometre 0.0001 terawatt-hours per square kilometre 0 terawatt-hours per square kilometre Ireland
1970s 0 terawatt-hours per square kilometre 0.0001 terawatt-hours per square kilometre 0.0001 terawatt-hours per square kilometre Spain
1980s 0 terawatt-hours per square kilometre 0 terawatt-hours per square kilometre 0 terawatt-hours per square kilometre Spain
1990s 0.0001 terawatt-hours per square kilometre 0.0001 terawatt-hours per square kilometre 0 terawatt-hours per square kilometre Ireland
2000s 0 terawatt-hours per square kilometre 0 terawatt-hours per square kilometre 0 terawatt-hours per square kilometre Spain
2010s -0 terawatt-hours per square kilometre -0 terawatt-hours per square kilometre 0 terawatt-hours per square kilometre Ireland
2020s -0 terawatt-hours per square kilometre -0 terawatt-hours per square kilometre 0 terawatt-hours per square kilometre Ireland

Averages of every year both report within each decade.

Frequently asked questions

Which has higher annual change in primary energy use, per square kilometre, Ireland or Spain?
Spain, at -0.0001 terawatt-hours per square kilometre against -0.0001 terawatt-hours per square kilometre in Ireland as of 2023.
What is the difference in annual change in primary energy use, per square kilometre between Ireland and Spain?
0 terawatt-hours per square kilometre, with Spain ahead.
How many years of comparable data are there for Ireland and Spain?
58 years are reported by both, from 1966 to 2023.
How do Ireland and Spain rank globally for annual change in primary energy use, per square kilometre?
Ireland ranks 182nd and Spain ranks 181st of 204 countries.
Where does this data come from?
Statizoid (derived), published as Annual change in primary energy use, per square kilometre. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Ireland vs Spain: Annual change in primary energy use, per square kilometre. Statizoid, drawing on Statizoid (derived). Retrieved 10 September 2026, from https://energy.statizoid.com/compare/annual-change-in-primary-energy-use-per-square-kilometre/ireland/spain/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under Derived by Statizoid from the sources named on the page; please keep the attribution.

<a href="https://energy.statizoid.com/compare/annual-change-in-primary-energy-use-per-square-kilometre/ireland/spain/">Ireland vs Spain: Annual change in primary energy use, per square kilometre</a> — Statizoid

About this data

Indicator
Annual change in primary energy use, per square kilometre
Unit
terawatt-hours per square kilometre
Source
Statizoid (derived)
Licence
Derived by Statizoid from the sources named on the page
Coverage
204 places, 9,193 data points, 1966–2023
Last refreshed

Annual change in primary energy use divided by Land area (sq. km), matched on country and year. Neither publisher issues this ratio as a series; it is computed here from both.