Georgia vs Slovenia: Electricity demand

Georgia
14.7 terawatt-hours
in 2025
Slovenia
14.31 terawatt-hours
in 2025
Georgia rank
99th
Slovenia rank
101st

Electricity demand over time

  • Georgia
  • Slovenia
051015199020072025

How they compare

Georgia currently reports 14.7 terawatt-hours against 14.31 terawatt-hours in Slovenia, a difference of 0.39 terawatt-hours.

The two have swapped places 1 time across 26 shared years of data; in 2000 it was Slovenia ahead.

Georgia ranks 99th and Slovenia ranks 101st of 214 countries.

Slovenia has averaged higher in every one of the 3 decades both report.

Head to head by decade

Decade Georgia Slovenia Difference Ahead
2000s 7.96 terawatt-hours 14.03 terawatt-hours 6.07 terawatt-hours Slovenia
2010s 10.92 terawatt-hours 14.86 terawatt-hours 3.95 terawatt-hours Slovenia
2020s 14.04 terawatt-hours 14.61 terawatt-hours 0.57 terawatt-hours Slovenia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity demand, Georgia or Slovenia?
Georgia, at 14.7 terawatt-hours against 14.31 terawatt-hours in Slovenia as of 2025.
What is the difference in electricity demand between Georgia and Slovenia?
0.39 terawatt-hours, with Georgia ahead.
How many years of comparable data are there for Georgia and Slovenia?
26 years are reported by both, from 2000 to 2025.
How do Georgia and Slovenia rank globally for electricity demand?
Georgia ranks 99th and Slovenia ranks 101st of 214 countries.
Where does this data come from?
Ember (2026) – with major processing by Our World in Data, published as Electricity demand. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Electricity demand
Unit
terawatt-hours
Source
Ember (2026) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
214 places, 5,717 data points, 1990–2025
Last refreshed

Measured in terawatt-hours.