Costa Rica vs Pre-demographic dividend: Electricity production from renewable sources, excluding

Costa Rica
66,027 kWh per square kilometre
in 2021
Pre-demographic dividend
502.34 kWh per square kilometre
in 2021
Costa Rica rank
43rd
Pre-demographic dividend rank
42nd

Electricity production from renewable sources, excluding over time

  • Costa Rica
  • Pre-demographic dividend
020.0k40.0k60.0k199020052021

How they compare

Costa Rica currently reports 66,027 kWh per square kilometre against 502.34 kWh per square kilometre in Pre-demographic dividend, a difference of 65,525 kWh per square kilometre.

That makes Costa Rica's figure about 131.4 times Pre-demographic dividend's.

Across all 32 years both countries report, Costa Rica has been ahead every year.

Costa Rica ranks 43rd and Pre-demographic dividend ranks 42nd of 208 countries.

Costa Rica has averaged higher in every one of the 4 decades both report.

Head to head by decade

Decade Costa Rica Pre-demographic dividend Difference Ahead
1990s 9,244 kWh per square kilometre -56.99 kWh per square kilometre 9,301 kWh per square kilometre Costa Rica
2000s 27,128 kWh per square kilometre 131.07 kWh per square kilometre 26,997 kWh per square kilometre Costa Rica
2010s 46,933 kWh per square kilometre 271.98 kWh per square kilometre 46,661 kWh per square kilometre Costa Rica
2020s 65,435 kWh per square kilometre 482.11 kWh per square kilometre 64,953 kWh per square kilometre Costa Rica

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity production from renewable sources, excluding, Costa Rica or Pre-demographic dividend?
Costa Rica, at 66,027 kWh per square kilometre against 502.34 kWh per square kilometre in Pre-demographic dividend as of 2021.
What is the difference in electricity production from renewable sources, excluding between Costa Rica and Pre-demographic dividend?
65,525 kWh per square kilometre, with Costa Rica ahead.
How many years of comparable data are there for Costa Rica and Pre-demographic dividend?
32 years are reported by both, from 1990 to 2021.
How do Costa Rica and Pre-demographic dividend rank globally for electricity production from renewable sources, excluding?
Costa Rica ranks 43rd and Pre-demographic dividend ranks 42nd of 208 countries.
Where does this data come from?
Statizoid (derived), published as Electricity production from renewable sources, excluding hydroelectric (kWh), per square kilometre. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Costa Rica vs Pre-demographic dividend: Electricity production from renewable sources, excluding. Statizoid, drawing on Statizoid (derived). Retrieved 09 September 2026, from https://energy.statizoid.com/compare/electricity-production-from-renewable-sources-excluding-hydroelectric-kwh-per-square/costa-rica/pre-demographic-dividend/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under Derived by Statizoid from the sources named on the page; please keep the attribution.

<a href="https://energy.statizoid.com/compare/electricity-production-from-renewable-sources-excluding-hydroelectric-kwh-per-square/costa-rica/pre-demographic-dividend/">Costa Rica vs Pre-demographic dividend: Electricity production from renewable sources, excluding</a> — Statizoid

About this data

Indicator
Electricity production from renewable sources, excluding hydroelectric (kWh), per square kilometre
Unit
kWh per square kilometre
Source
Statizoid (derived)
Licence
Derived by Statizoid from the sources named on the page
Coverage
255 places, 7,259 data points, 1990–2021
Last refreshed

Electricity production from renewable sources, excluding hydroelectric (kWh) divided by Land area (sq. km), matched on country and year. Neither publisher issues this ratio as a series; it is computed here from both.