Curacao vs High income: Electricity production from renewable sources, excluding … square

Curacao
347,973 kWh per square kilometre
in 2021
High income
35,464 kWh per square kilometre
in 2021
Curacao rank
11th
High income rank
13th

Electricity production from renewable sources, excluding … square over time

  • Curacao
  • High income
0200.0k400.0k600.0k199020052021

How they compare

Curacao currently reports 347,973 kWh per square kilometre against 35,464 kWh per square kilometre in High income, a difference of 312,509 kWh per square kilometre.

That makes Curacao's figure about 9.8 times High income's.

Across all 11 years both countries report, Curacao has been ahead every year.

Curacao ranks 11th and High income ranks 13th of 208 countries.

Curacao has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Curacao High income Difference Ahead
2010s 342,700 kWh per square kilometre 21,017 kWh per square kilometre 321,684 kWh per square kilometre Curacao
2020s 407,365 kWh per square kilometre 34,265 kWh per square kilometre 373,100 kWh per square kilometre Curacao

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity production from renewable sources, excluding, Curacao or High income?
Curacao, at 347,973 kWh per square kilometre against 35,464 kWh per square kilometre in High income as of 2021.
What is the difference in electricity production from renewable sources, excluding between Curacao and High income?
312,509 kWh per square kilometre, with Curacao ahead.
How many years of comparable data are there for Curacao and High income?
11 years are reported by both, from 2011 to 2021.
How do Curacao and High income rank globally for electricity production from renewable sources, excluding?
Curacao ranks 11th and High income ranks 13th of 208 countries.
Where does this data come from?
Statizoid (derived), published as Electricity production from renewable sources, excluding hydroelectric (kWh), per square kilometre. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Curacao vs High income: Electricity production from renewable sources, excluding. Statizoid, drawing on Statizoid (derived). Retrieved 13 November 2026, from https://energy.statizoid.com/compare/electricity-production-from-renewable-sources-excluding-hydroelectric-kwh-per-square/curacao/high-income/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under Derived by Statizoid from the sources named on the page; please keep the attribution.

<a href="https://energy.statizoid.com/compare/electricity-production-from-renewable-sources-excluding-hydroelectric-kwh-per-square/curacao/high-income/">Curacao vs High income: Electricity production from renewable sources, excluding</a> — Statizoid

About this data

Indicator
Electricity production from renewable sources, excluding hydroelectric (kWh), per square kilometre
Unit
kWh per square kilometre
Source
Statizoid (derived)
Licence
Derived by Statizoid from the sources named on the page
Coverage
255 places, 7,259 data points, 1990–2021
Last refreshed

Electricity production from renewable sources, excluding hydroelectric (kWh) divided by Land area (sq. km), matched on country and year. Neither publisher issues this ratio as a series; it is computed here from both.