Grenada vs São Tomé and Príncipe, Democratic Republic of: Coal production

Grenada
0 terawatt-hours
in 2024
São Tomé and Príncipe, Democratic Republic of
0 terawatt-hours
in 2024
Grenada rank
68th
São Tomé and Príncipe, Democratic Republic of rank
68th

Coal production over time

  • Grenada
  • São Tomé and Príncipe, Democratic Republic of
00.20.40.60.81198020022024

How they compare

Grenada currently reports 0 terawatt-hours against 0 terawatt-hours in São Tomé and Príncipe, Democratic Republic of, a difference of 0 terawatt-hours.

Across all 45 years both countries report, São Tomé and Príncipe, Democratic Republic of has been ahead every year.

Grenada ranks 68th and São Tomé and Príncipe, Democratic Republic of ranks 68th of 216 countries.

Head to head by decade

Decade Grenada São Tomé and Príncipe, Democratic Republic of Difference Ahead
1980s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours
1990s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours
2000s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours
2010s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours
2020s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours

Averages of every year both report within each decade.

Frequently asked questions

Which has higher coal production, Grenada or São Tomé and Príncipe, Democratic Republic of?
Grenada, at 0 terawatt-hours against 0 terawatt-hours in São Tomé and Príncipe, Democratic Republic of as of 2024.
What is the difference in coal production between Grenada and São Tomé and Príncipe, Democratic Republic of?
0 terawatt-hours, with Grenada ahead.
How many years of comparable data are there for Grenada and São Tomé and Príncipe, Democratic Republic of?
45 years are reported by both, from 1980 to 2024.
How do Grenada and São Tomé and Príncipe, Democratic Republic of rank globally for coal production?
Grenada ranks 68th and São Tomé and Príncipe, Democratic Republic of ranks 68th of 216 countries.
Where does this data come from?
Energy Institute - Statistical Review of World Energy (2026) and other sources – with major processing by Our World in Data, published as Coal production. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Grenada vs São Tomé and Príncipe, Democratic Republic of: Coal production. Statizoid, drawing on Energy Institute - Statistical Review of World Energy (2026) and other sources – with major processing by Our World in Data. Retrieved 18 August 2026, from https://energy.statizoid.com/compare/fossil-fuels/grenada/sao-tome-and-principe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://energy.statizoid.com/compare/fossil-fuels/grenada/sao-tome-and-principe/">Grenada vs São Tomé and Príncipe, Democratic Republic of: Coal production</a> — Statizoid

About this data

Indicator
Coal production
Unit
terawatt-hours
Source
Energy Institute - Statistical Review of World Energy (2026) and other sources – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
222 places, 15,014 data points, 1700–2025
Last refreshed

Measured in terawatt-hours.