Electricity demand in South Sudan

South Sudan: Electricity demand was 0.56 terawatt-hours in 2024. ▲ Rising

Latest (2024)
0.56 terawatt-hours
Change on year
unchanged
World rank
179th
of 214 countries
All-time high
0.58 terawatt-hours
in 2015
All-time low
0.44 terawatt-hours
in 2012
Years of data
13
2012–2024

Electricity demand in South Sudan, 2012–2024

00.20.40.62012201820242012: 0.44 terawatt-hours2013: 0.47 terawatt-hours2014: 0.48 terawatt-hours2015: 0.58 terawatt-hours2016: 0.52 terawatt-hours2017: 0.54 terawatt-hours2018: 0.54 terawatt-hours2019: 0.55 terawatt-hours2020: 0.56 terawatt-hours2021: 0.57 terawatt-hours2022: 0.51 terawatt-hours2023: 0.56 terawatt-hours2024: 0.56 terawatt-hours

Source: Ember (2026) – with major processing by Our World in Data. Measured in terawatt-hours.

Analysis

South Sudan recorded 0.56 terawatt-hours for electricity demand in 2024.

That represents a change of up 16.7% over ten years.

Over the whole period, electricity demand in South Sudan peaked at 0.58 terawatt-hours in 2015 and was at its lowest, 0.44 terawatt-hours, in 2012.

South Sudan ranks 179th of 214 countries on this measure, in the bottom quarter.

The long-run direction has been consistently rising across the 13 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2010s 0.515 terawatt-hours 0.44 terawatt-hours 0.58 terawatt-hours 8
2020s 0.552 terawatt-hours 0.51 terawatt-hours 0.57 terawatt-hours 5

Countries ranked near South Sudan

  1. 176 Lesotho 0.58 terawatt-hours compare
  2. 177 Burundi 0.57 terawatt-hours compare
  3. 177 Liberia 0.57 terawatt-hours compare
  4. 180 Cape Verde 0.52 terawatt-hours compare
  5. 181 East Timor 0.51 terawatt-hours compare
  6. 181 Gambia 0.51 terawatt-hours compare

See the full ranking of 214 places →

More energy & mining data for South Sudan

All data for South Sudan →

Frequently asked questions

What is electricity demand in South Sudan?
Electricity demand in South Sudan was 0.56 terawatt-hours in 2024, according to Ember (2026) – with major processing by Our World in Data.
What is the highest electricity demand recorded in South Sudan?
The highest recorded value was 0.58 terawatt-hours in 2015.
What is the lowest electricity demand recorded in South Sudan?
The lowest recorded value was 0.44 terawatt-hours in 2012.
How does South Sudan rank for electricity demand?
South Sudan ranks 179th out of 214 countries with data for 2024.
Is electricity demand rising or falling in South Sudan?
Over the last ten years it is up 16.7%. The long-run trend across the full record is rising.
Where does this South Sudan data come from?
The figures come from Ember (2026) – with major processing by Our World in Data, published as part of Electricity demand. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 13 observations, free to reuse under CC BY 4.0 (Our World in Data).

About this data

Indicator
Electricity demand
Unit
terawatt-hours
Source
Ember (2026) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
214 places, 5,717 data points, 1990–2025
Last refreshed

Measured in terawatt-hours.