Electricity demand in Spain

Spain: Electricity demand was 275.1 terawatt-hours in 2025. ▲ Rising

Latest (2025)
275.1 terawatt-hours
Change on year
up 1.6%
World rank
21st
of 214 countries
All-time high
298.75 terawatt-hours
in 2008
All-time low
150.74 terawatt-hours
in 1990
Years of data
36
1990–2025

Electricity demand in Spain, 1990–2025

01002003001990200720251990: 150.7 terawatt-hours1991: 154 terawatt-hours1992: 157.3 terawatt-hours1993: 156.4 terawatt-hours1994: 162.1 terawatt-hours1995: 169.6 terawatt-hours1996: 174.3 terawatt-hours1997: 186.1 terawatt-hours1998: 196.8 terawatt-hours1999: 211.3 terawatt-hours2000: 225.4 terawatt-hours2001: 236.5 terawatt-hours2002: 245.2 terawatt-hours2003: 258.6 terawatt-hours2004: 273.6 terawatt-hours2005: 288.1 terawatt-hours2006: 292.3 terawatt-hours2007: 296.1 terawatt-hours2008: 298.8 terawatt-hours2009: 282.6 terawatt-hours2010: 289.5 terawatt-hours2011: 285.4 terawatt-hours2012: 282.8 terawatt-hours2013: 274.7 terawatt-hours2014: 271 terawatt-hours2015: 277 terawatt-hours2016: 278.4 terawatt-hours2017: 281.6 terawatt-hours2018: 282.5 terawatt-hours2019: 277.4 terawatt-hours2020: 262.8 terawatt-hours2021: 271.6 terawatt-hours2022: 267.4 terawatt-hours2023: 265.1 terawatt-hours2024: 270.7 terawatt-hours2025: 275.1 terawatt-hours

Source: Ember (2026) – with major processing by Our World in Data. Measured in terawatt-hours.

Analysis

Spain recorded 275.1 terawatt-hours for electricity demand in 2025.

That represents a change of up 1.6% on the previous year and down 0.7% over ten years.

Over the whole period, electricity demand in Spain peaked at 298.75 terawatt-hours in 2008 and was at its lowest, 150.74 terawatt-hours, in 1990.

Spain ranks 21st of 214 countries on this measure, in the top 10%.

The long-run direction has been consistently rising across the 36 years of available data.

Electricity demand in Spain, year by year

Annual values for Electricity demand in Spain, 1990 to 2025.
Year terawatt-hours Change
1990 150.74 terawatt-hours
1991 154.03 terawatt-hours +2.2%
1992 157.29 terawatt-hours +2.1%
1993 156.39 terawatt-hours -0.6%
1994 162.05 terawatt-hours +3.6%
1995 169.56 terawatt-hours +4.6%
1996 174.27 terawatt-hours +2.8%
1997 186.06 terawatt-hours +6.8%
1998 196.79 terawatt-hours +5.8%
1999 211.35 terawatt-hours +7.4%
2000 225.36 terawatt-hours +6.6%
2001 236.52 terawatt-hours +5.0%
2002 245.24 terawatt-hours +3.7%
2003 258.56 terawatt-hours +5.4%
2004 273.58 terawatt-hours +5.8%
2005 288.12 terawatt-hours +5.3%
2006 292.31 terawatt-hours +1.5%
2007 296.11 terawatt-hours +1.3%
2008 298.75 terawatt-hours +0.9%
2009 282.62 terawatt-hours -5.4%
2010 289.47 terawatt-hours +2.4%
2011 285.45 terawatt-hours -1.4%
2012 282.75 terawatt-hours -0.9%
2013 274.71 terawatt-hours -2.8%
2014 271.03 terawatt-hours -1.3%
2015 277.04 terawatt-hours +2.2%
2016 278.37 terawatt-hours +0.5%
2017 281.55 terawatt-hours +1.1%
2018 282.5 terawatt-hours +0.3%
2019 277.38 terawatt-hours -1.8%
2020 262.75 terawatt-hours -5.3%
2021 271.6 terawatt-hours +3.4%
2022 267.35 terawatt-hours -1.6%
2023 265.15 terawatt-hours -0.8%
2024 270.71 terawatt-hours +2.1%
2025 275.1 terawatt-hours +1.6%

Spain compared with similar countries

  • Spain's 275.1 terawatt-hours is above the median for high income countries, which is 36.53 terawatt-hours, 7.5× the median. (75 countries reporting)
  • Spain's 275.1 terawatt-hours is above the median for Europe & Central Asia, which is 37.64 terawatt-hours, 7.3× the median. (51 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
1990s 171.85 terawatt-hours 150.74 terawatt-hours 211.35 terawatt-hours 10
2000s 269.72 terawatt-hours 225.36 terawatt-hours 298.75 terawatt-hours 10
2010s 280.02 terawatt-hours 271.03 terawatt-hours 289.47 terawatt-hours 10
2020s 268.78 terawatt-hours 262.75 terawatt-hours 275.1 terawatt-hours 6

Countries ranked near Spain

  1. 18 Italy 311.6 terawatt-hours compare
  2. 19 Taiwan 288.39 terawatt-hours compare
  3. 20 Australia 286.34 terawatt-hours compare
  4. 22 Egypt 244.31 terawatt-hours compare
  5. 23 South Africa 236.84 terawatt-hours compare
  6. 24 Thailand 225.1 terawatt-hours compare

See the full ranking of 214 places →

More energy & mining data for Spain

All data for Spain →

Frequently asked questions

What is electricity demand in Spain?
Electricity demand in Spain was 275.1 terawatt-hours in 2025, according to Ember (2026) – with major processing by Our World in Data.
What is the highest electricity demand recorded in Spain?
The highest recorded value was 298.75 terawatt-hours in 2008.
What is the lowest electricity demand recorded in Spain?
The lowest recorded value was 150.74 terawatt-hours in 1990.
How does Spain rank for electricity demand?
Spain ranks 21st out of 214 countries with data for 2025.
Is electricity demand rising or falling in Spain?
Over the last ten years it is down 0.7%. The long-run trend across the full record is rising.
Where does this Spain data come from?
The figures come from Ember (2026) – with major processing by Our World in Data, published as part of Electricity demand. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 36 observations, free to reuse under CC BY 4.0 (Our World in Data).

Share, cite or embed this page

Cite this page

Electricity demand in Spain. Statizoid, drawing on Ember (2026) – with major processing by Our World in Data. Retrieved 23 September 2026, from https://energy.statizoid.com/stat/electricity-demand/spain/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://energy.statizoid.com/stat/electricity-demand/spain/">Electricity demand in Spain</a> — Statizoid

About this data

Indicator
Electricity demand
Unit
terawatt-hours
Source
Ember (2026) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
214 places, 5,717 data points, 1990–2025
Last refreshed

Measured in terawatt-hours.