Annual change in primary energy from coal in India
India: Annual change in primary energy from coal was 20.94 terawatt-hours in 2025. ◆ Volatile
Annual change in primary energy from coal in India, 1966–2025
Source: Energy Institute – Statistical Review of World Energy (2026) – with major processing by Our World in Data. Measured in terawatt-hours.
Analysis
India recorded 20.94 terawatt-hours for annual change in primary energy from coal in 2025.
The figure is down 91.6% on the previous year and down 76.6% over ten years.
Over the whole period, annual change in primary energy from coal in India peaked at 638.12 terawatt-hours in 2021 and was at its lowest, -274.35 terawatt-hours, in 2020.
That places India 5th out of 79 countries with data for 2025, putting it in the top 10%.
The series is highly variable year to year, so single readings are best treated with caution.
Annual change in primary energy from coal in India, year by year
| Year | terawatt-hours | Change |
|---|---|---|
| 1966 | -0.992 terawatt-hours | — |
| 1967 | 6.87 terawatt-hours | -792.5% |
| 1968 | 14.54 terawatt-hours | +111.6% |
| 1969 | 27.02 terawatt-hours | +85.8% |
| 1970 | -24.03 terawatt-hours | -189.0% |
| 1971 | 6.06 terawatt-hours | -125.2% |
| 1972 | 24.81 terawatt-hours | +309.2% |
| 1973 | -6.23 terawatt-hours | -125.1% |
| 1974 | 59.41 terawatt-hours | -1053.0% |
| 1975 | 39.05 terawatt-hours | -34.3% |
| 1976 | 23.13 terawatt-hours | -40.8% |
| 1977 | 27.31 terawatt-hours | +18.1% |
| 1978 | -19.68 terawatt-hours | -172.1% |
| 1979 | 36.83 terawatt-hours | -287.1% |
| 1980 | 32.07 terawatt-hours | -12.9% |
| 1981 | 82.58 terawatt-hours | +157.5% |
| 1982 | -8.24 terawatt-hours | -110.0% |
| 1983 | 45.14 terawatt-hours | -648.0% |
| 1984 | 39.26 terawatt-hours | -13.0% |
| 1985 | 39.09 terawatt-hours | -0.4% |
| 1986 | 63.84 terawatt-hours | +63.3% |
| 1987 | 90.39 terawatt-hours | +41.6% |
| 1988 | 73.93 terawatt-hours | -18.2% |
| 1989 | 94.38 terawatt-hours | +27.7% |
| 1990 | 96.08 terawatt-hours | +1.8% |
| 1991 | 81.85 terawatt-hours | -14.8% |
| 1992 | 80.38 terawatt-hours | -1.8% |
| 1993 | 51.37 terawatt-hours | -36.1% |
| 1994 | 47.66 terawatt-hours | -7.2% |
| 1995 | 94.33 terawatt-hours | +97.9% |
| 1996 | 46.87 terawatt-hours | -50.3% |
| 1997 | 76.88 terawatt-hours | +64.0% |
| 1998 | 58.3 terawatt-hours | -24.2% |
| 1999 | -16.99 terawatt-hours | -129.1% |
| 2000 | 114.49 terawatt-hours | -774.1% |
| 2001 | 15.79 terawatt-hours | -86.2% |
| 2002 | 85.84 terawatt-hours | +443.7% |
| 2003 | 95.19 terawatt-hours | +10.9% |
| 2004 | 135.54 terawatt-hours | +42.4% |
| 2005 | 212.59 terawatt-hours | +56.8% |
| 2006 | 93.75 terawatt-hours | -55.9% |
| 2007 | 240.41 terawatt-hours | +156.4% |
| 2008 | 230.49 terawatt-hours | -4.1% |
| 2009 | 247.5 terawatt-hours | +7.4% |
| 2010 | 80.28 terawatt-hours | -67.6% |
| 2011 | 130.32 terawatt-hours | +62.3% |
| 2012 | 308.95 terawatt-hours | +137.1% |
| 2013 | 221.91 terawatt-hours | -28.2% |
| 2014 | 391.34 terawatt-hours | +76.4% |
| 2015 | 89.4 terawatt-hours | -77.2% |
| 2016 | 97.22 terawatt-hours | +8.8% |
| 2017 | 149.46 terawatt-hours | +53.7% |
| 2018 | 244.44 terawatt-hours | +63.5% |
| 2019 | 7.42 terawatt-hours | -97.0% |
| 2020 | -274.35 terawatt-hours | -3796.5% |
| 2021 | 638.12 terawatt-hours | -332.6% |
| 2022 | 208.54 terawatt-hours | -67.3% |
| 2023 | 575.89 terawatt-hours | +176.2% |
| 2024 | 250.47 terawatt-hours | -56.5% |
| 2025 | 20.94 terawatt-hours | -91.6% |
India compared with similar countries
- India's 20.94 terawatt-hours is above the median for lower middle income countries, which is 13.46 terawatt-hours, 1.6× the median. (7 countries reporting)
Biggest year-on-year movements
Years where Annual change in primary energy from coal in India changed far more than this series normally does. A large move can be a real event or a change in how the figure was measured — the source note below says who published it.
| Year | Change | From | To |
|---|---|---|---|
| 2020 | -3796.5% | 7.42 terawatt-hours | -274.35 terawatt-hours |
| 1974 | +1053.0% | -6.23 terawatt-hours | 59.41 terawatt-hours |
| 1967 | +792.5% | -0.992 terawatt-hours | 6.87 terawatt-hours |
| 2000 | +774.1% | -16.99 terawatt-hours | 114.49 terawatt-hours |
| 1983 | +648.0% | -8.24 terawatt-hours | 45.14 terawatt-hours |
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 1960s | 11.86 terawatt-hours | -0.992 terawatt-hours | 27.02 terawatt-hours | 4 |
| 1970s | 16.67 terawatt-hours | -24.03 terawatt-hours | 59.41 terawatt-hours | 10 |
| 1980s | 55.24 terawatt-hours | -8.24 terawatt-hours | 94.38 terawatt-hours | 10 |
| 1990s | 61.67 terawatt-hours | -16.99 terawatt-hours | 96.08 terawatt-hours | 10 |
| 2000s | 147.16 terawatt-hours | 15.79 terawatt-hours | 247.5 terawatt-hours | 10 |
| 2010s | 172.08 terawatt-hours | 7.42 terawatt-hours | 391.34 terawatt-hours | 10 |
| 2020s | 236.6 terawatt-hours | -274.35 terawatt-hours | 638.12 terawatt-hours | 6 |
Countries ranked near India
- 2 Indonesia 120.4 terawatt-hours compare
- 3 Kazakhstan 29.28 terawatt-hours compare
- 4 Bangladesh 28.46 terawatt-hours compare
- 6 Vietnam 20.29 terawatt-hours compare
- 7 Pakistan 17.13 terawatt-hours compare
- 8 Uzbekistan 13.46 terawatt-hours compare
More energy & mining data for India
- Fossil fuel consumption by fuel, per unit of GDP 0 terawatt-hours per US$ of GDP (2025)
- Primary energy use, annual growth rate 0.7224 % change on previous year (2025)
- Coal consumption, per capita 0 terawatt-hours per person (2025)
- Coal consumption, per unit of GDP 0 terawatt-hours per US$ of GDP (2025)
- Primary energy use, per unit of GDP 0 terawatt-hours per US$ of GDP (2025)
- Primary energy use, per capita 0 terawatt-hours per person (2025)
- Coal production, per capita 0 terawatt-hours per person (2025)
- Coal production, per unit of GDP 0 terawatt-hours per US$ of GDP (2025)
- Fossil fuel consumption by fuel, per capita 0 terawatt-hours per person (2025)
- Fuel imports 31.5% (2024)
Frequently asked questions
- What is annual change in primary energy from coal in India?
- Annual change in primary energy from coal in India was 20.94 terawatt-hours in 2025, according to Energy Institute – Statistical Review of World Energy (2026) – with major processing by Our World in Data.
- What is the highest annual change in primary energy from coal recorded in India?
- The highest recorded value was 638.12 terawatt-hours in 2021.
- What is the lowest annual change in primary energy from coal recorded in India?
- The lowest recorded value was -274.35 terawatt-hours in 2020.
- How does India rank for annual change in primary energy from coal?
- India ranks 5th out of 79 countries with data for 2025.
- Is annual change in primary energy from coal rising or falling in India?
- Over the last ten years it is down 76.6%. The long-run trend across the full record is volatile.
- Where does this India data come from?
- The figures come from Energy Institute – Statistical Review of World Energy (2026) – with major processing by Our World in Data, published as part of Annual change in primary energy from coal. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 60 observations, free to reuse under CC BY 4.0 (Our World in Data).
About this data
Change in total energy supply relative to the previous year, measured in terawatt-hours.